The time a dynamic compaction project will take depends on several factors:
- Size of the area
- Required depth and degree of improvement
- Number of drops per point and grid spacing
- Soil conditions and variability
- Weather and site access
A “typical” project may last from a few days for small pads to several months for large‑scale sites. Production rates are generally high because the method delivers a significant amount of energy in a short duration.