The time a dynamic compaction project will take depends on several factors:

  • Size of the area
  • Required depth and degree of improvement
  • Number of drops per point and grid spacing
  • Soil conditions and variability
  • Weather and site access

A “typical” project may last from a few days for small pads to several months for large‑scale sites. Production rates are generally high because the method delivers a significant amount of energy in a short duration.