
Published in Deep Foundations Magazine, May/June 2023
Published in Deep Foundations Magazine, May/June 2023
By Brian McGlynn, P.E.
Despite bidders being in line with the project specifications and requirements, a wick drain installation contract ended up costing the owner significantly more than anticipated in both time and money. In this case study, discover why an appropriately phased geotechnical investigation, as well as a contract structure that allows for changes to means and methods to accommodate new information, would have made all the difference.
To read the entire article, please download the PDF