Grand Valley State University – L. William Seidman Center

Project Details:

Owner: Seidman College of Business at Grand Valley State University
General Contractor: Pioneer Construction
Duration of Work: 5 weeks
Subsurface Conditions: Variable sand fill with soft silt and clay layers with some wood chips
Approximate Key Quantities: 1,100 Controlled Modulus Columns (CMC)® rigid inclusions

Project Overview:

The construction of the 40,000 square foot Seidman College of Business at Grand Valley State University included a four-story academic center with exterior courtyards and planters. Support was required for all floor slabs, footings and exterior planters. The original design called for augercast piles or micropiles with a structural slab, pile cap and grade beam foundation system. Menard and Nicholson Construction Company (NCC), an affiliate company of Menard, worked together using a unique combination of techniques to provide a more economical design.

Ground Conditions:

The project site consisted primarily of variable sand fill to a depth of 10 to 30 feet with areas of soft silt and clay layers. In addition, a large portion of the site contained woodchips at depths ranging from 5 to 25 feet.

Below the existing fill and an underlying dense sand layer, were alternating layers of weathered shale and gypsum. Preliminary rock probing indicated the presence of voids, ranging in thickness from 2 to 14 inches. The excessive settlement of nearby structures had been attributed to similar voids, so the mitigation of this concern was critical to the project.

Solution:

NCC was initially contacted to provide a design for micropiles underneath the building footings and grade beams. This system would require that all micropiles be drilled into bedrock in order to grout any voids encountered. In an effort to provide cost savings to the client, NCC teamed with Menard to provide an alternative scheme.

NCC performed Low Mobility Grouting (LMG) to fill voids at select locations across the site within the weathered bedrock. This technique is proven to prevent further void development and settlement in the Grand Rapids area. Menard installed Controlled Modulus Columns (CMC)® rigid inclusions that terminated in the dense sand layer that was present above the weathered bedrock.

This combined design of CMC rigid inclusions and LMG was not only more economical than a deep foundation system, that would have extended into the bedrock, but also offered substantial savings in the foundation itself by allowing the client to eliminate grade beams pile caps, structural slabs and utilize shallow foundations.