Bass River Bridge
Bass River Bridge
Project Details:
Owner: New Jersey Turnpike Authority (NJTA)
General Contractor: Northeast Remsco Construction, Inc.
Duration of Work: 8 weeks
Subsurface Conditions: Medium to dense sand over very soft organics and dense sand layer
Approximate Key Quantities: 1,200 Controlled Modulus Columns (CMC)® rigid inclusions
Project Overview:
The Bass River Bridge widening and rehabilitation was a four-year project on the Garden State Parkway near Tuckerton, New Jersey. It is part of a large-scale effort by the New Jersey Turnpike Authority (NJTA) to add lanes and reduce traffic on the heavily traveled shore route.
The project involves the construction of a new span over the Bass River and U.S. Route 9, as well as the rehabilitation of the existing bridge. The specifications called for four Mechanically Stabilized Earth (MSE) retaining walls up to 40 feet tall (two parallel walls at each approach with backfill in between the reinforced zones). To support the embankments, cement grouted columns installed in two phases were specified by the NJTA. The first phase was for support of the tall, lower walls. Then, when the lower walls had been partially built, the second phase would support the upper walls built into the existing roadway embankment. Menard provided ground improvement using Controlled Modulus Columns (CMC)® rigid inclusions to support the bridge approach and embankments.
Ground Conditions:
Solution:
Several ground improvement options were considered for the project, including auger cast-in-place piles, vibro concrete columns and aggregate piers. CMC Rigid Inclusions were selected as the most appropriate solution to improve the soil prior to MSE wall construction based on Menard’s experience with similar projects, construction schedule, and cost-effectiveness.
More than 1,200 CMC Rigid Inclusions were installed to depths ranging from 13 to 48 feet. This ground improvement solution reduced post-construction settlement to acceptable levels, improved the bearing capacity and global stability of the tall walls, and supported four MSE walls.
The MSE retaining walls were designed by The Reinforced Earth Company, an affiliate company of Menard and member of the Soletanche Freyssinet Group.