FedEx Freight Distribution Center
FedEx Freight Distribution Center
Project Details:
Owner: FedEx Ground
General Contractor: RC Andersen, LLC
Date of Work: November 2016 - January 2017
Engineer: Langan Engineering
Approximate Key Quantities: Controlled Modulus Column (CMC)®- 2,022 EA
Project Overview:
Ground Conditions:
Solution:
The presence of an existing foundation within the site’s footprint required Menard to predrill the upper dense fill to penetrate the obstructions before CMC rigid inclusion installation could begin. Menard’s design was a cost effective alternative to piles or a structural slab. Other alternatives would have required more excavation, more time, and possibly a longer schedule as Menard crews were able to work through the winter months and inclement weather conditions.
A total of 2,022 CMC rigid inclusions were installed to maximum depths of 38 ft.